Skip to main content

Atlantem, a subsidiary of the Herige Industries group, designs and manufactures windows and doors on an industrial scale. To reduce its material consumption without slowing down production, the company turned to Reeverse Systems and its Material Management System (MMS). Its Quality Director looks back on this choice, how it fits the company's industrial and CSR strategy, and how the teams adopted the tool.

Key takeaways

  • Company : Atlantem (Herige Industries), industrial manufacturer of windows and doors;

  • Testimonial : the Quality Director;

  • Challenge : reducing material consumption while increasing productivity, in line with CSR goals;

  • Solution : the Reeverse Systems Material Management System (MMS), rolled out with the operators;

  • Result : teams up and running within minutes to a few hours, and a smooth, positive transition.

Why did you choose Reeverse Systems?

We were already working on ways to reduce our material consumption when we met Reeverse Systems.

“We quickly realized they were doing the same thing as us… but faster!”

 

Our industrial strategy aims to optimize our material consumption while increasing our productivity. The Reeverse Systems solution was a natural fit with this approach.

On the CSR side, the convergence of our objectives with those of Reeverse Systems made the collaboration obvious: it was a real match.

  • Operator carrying a profile past a rack of window and door profiles at Atlantem

An operator carries a profile through Atlantem's workshop, past a rack of window and door profiles in a range of colors. Photo taken by Reeverse Systems.

How did your teams handle the transition?

We worked hand in hand with the operators. The support provided by Reeverse Systems was highly effective: within a few minutes, or a few hours depending on the profile, the teams were up and running.

“All our fears about getting to grips with the solution vanished”

 

For management, the impact was more significant, but the transition went smoothly and positively. Everyone quickly saw the concrete benefits of the solution in the field.

How much material could your plant save?

Measure your real scrap rate from a single cutting file, with no commitment.

No commitment
Results in 2 weeks
Reply within 48 hours

Learn more

👉The full Atlantem case study;

👉The interview with Atlantem's industrial director;

👉The interview with Atlantem's industrial IT project manager;

👉The interview with an Atlantem operator.